top of page
fddafa.png

EcoPower Solar Park

Harnessing the Potential of Renewable Energy

pin.png

Wielkopolskie, Poland

Location

calendar (1).png

14 грудня 2024 р.

Completion Date

dimension.png

40

Size (m2)

battery.png

40

Capacity

Overview

EcoPower Solar Park is a state-of-the-art photovoltaic farm located in the Wielkopolskie region of Poland. Designed and constructed by ISPIK, this project exemplifies our commitment to green energy and sustainable development. With a total capacity of 40 MW, it powers thousands of households while significantly reducing carbon emissions.

Completed in 2023, the EcoPower Solar Park is a milestone in renewable energy, combining advanced technology with innovative design to maximize efficiency and minimize environmental impact.

Details

EcoPower Solar Park, located in the Wielkopolskie region of Poland, is a groundbreaking renewable energy project with a total capacity of 40 MW. Covering 70 hectares, the park was completed in June 2023 after 14 months of dedicated work by ISPIK’s expert team. The project was commissioned by Green Energy Solutions Ltd. to power over 25,000 households annually while significantly reducing environmental impact.

The park features high-efficiency monocrystalline photovoltaic panels and advanced inverter systems, ensuring optimized energy output and reliability. Integrated 24/7 monitoring systems allow for real-time performance tracking, maximizing efficiency and minimizing maintenance needs. EcoPower Solar Park generates approximately 58,000 MWh of clean energy annually, reducing CO2 emissions by an estimated 25,000 tons each year.

Despite challenges like uneven terrain and variable weather conditions, ISPIK’s innovative approach ensured the successful implementation of adaptive designs and sustainable land use, with minimal disruption to local ecosystems. The project also contributed to the local community by creating over 120 jobs during construction and improving surrounding infrastructure, reinforcing ISPIK’s commitment to environmental sustainability and community growth.

EcoPower Solar Park

calendar (1).png

Completion Date:

14 грудня 2024 р.

Location:

Wielkopolskie, Poland

dimension.png

Size (m2):

40

battery.png

Capacity (MW):

40

fddafa.png

ISPIK

We are green energy company that provide high quality of services

bottom of page